| AOGCC Pool Statistics | Prudhoe Bay Unit, PM Undef Oil Pool |
|
| Operator: | BP Exploration (Alaska) Inc. | |
| Discovery Well: | BP Exploration (Alaska) Inc. | ||
| Prudhoe Bay Un PTM P1-09 | |||
| Permit #196-154 | |||
| API No. 50-029-22704-00-00 | |||
| Sec. 16, T12N, R14E, UM | |||
|
| Depth: 13,242’ MD / 10,055' TVD | ||
|
| January 25, 1997 |
| Status: | Plugged and Abandoned | ||||
| Location: | Central Arctic Slope | Area Location Map | DNR Unit Map | ||
| Orders: | Complete List | ||||
| Summary: | The Point
McIntyre Undefined Oil Pool was drilled and produced by
a single well, Point McIntyre P1-09. This well was
drilled to a depth of 13,242' measured depth (10,055' true
vertical depth), perforated in the lower Shublik Formation
and the uppermost Ivishak Formation (13,020' to 13,070'
measured depth; 9,976' to 9,994' true vertical depth),
and tested during January and February 1997. Total
recovery was 33,480 barrels of oil, 30,008 MCF of gas,
and 13,127 barrels of water over 31 operating days, which
yield average daily production rates of 1,080 barrels of
oil, 968 MCF of gas, and 423 barrels of water. The
perforations in this undefined pool were plugged by cement
squeeze on May 16, 1997.
|
||||
| Strat Column | |||||
| Orig. Oil in Place: | Not published |
| Production: | Prod Report | Prod Data |
| Oil (bbls) | NGL (bbls) | Gas (mcf) | Water (bbls) | |
| Cumulative | 33,480 |
0 | 30,008 | 13,127 |
| 2001 Total | 0 | 0 | 0 | 0 |
| 2002 Total | 0 | 0 | 0 | 0 |
| 2003 Total | 0 | 0 | 0 | 0 |
| 2004 Total | 0 | 0 | 0 | 0 |
| 2003 Daily Rate | 0 | 0 | 0 | 0 |
| 2004 Daily Rate | 0 | 0 | 0 | 0 |
| Change (%) | 0 | 0 | 0 | 0 |